Frank Maynard (owner and sales and head project manager) and New England Kitchen & Bath (”NKKB”) were hired to perform an 8 week kitchen refurbishing job. The project started on July 9, 2019 and still has not been completed to our satisfaction (3/22/20)
In the process they ruined our adjoining family room floor (can provide photos) with their subcontractor, and in their attempt to fix it provided old unmatching wood that Frank dug up from some other job that did not match the existing oak floor, used different wood species that was not woven in to look like the rest of the floor, as promised. When we complained during the process of repair, Frank and his subcontractor kept saying don’t worry when its done it will all blend in and it does not, not even close.
New England Kitchen & Bath Reviews
Frank Maynard (owner and sales and head project manager) and New England Kitchen & Bath (”NKKB”) were hired to perform an 8 week kitchen refurbishing job. The project started on July 9, 2019 and still has not been completed to our satisfaction (3/22/20)
In the process they ruined our adjoining family room floor (can provide photos) with their subcontractor, and in their attempt to fix it provided old unmatching wood that Frank dug up from some other job that did not match the existing oak floor, used different wood species that was not woven in to look like the rest of the floor, as promised. When we complained during the process of repair, Frank and his subcontractor kept saying don’t worry when its done it will all blend in and it does not, not even close.