Branko was hired to completely rewire the first and second floor of a two flat along with putting in complete new furnace and duct work and air conditioning. After ten months of fighting with him to finish and the work is still incomplete and many mistakes.
Branko did not put the electrical boxes in to account for half inch of drywall and now when I put the drywall up the boxes will be sunk in the wall and the drywall will extend past the boxes. I discussed this problem when he first started working on the second floor and he continued to make the same mistake on the first floor. He tried to correct some of the boxes on the second floor where I had already had the drywall completed and he cut big holes in the drywall and then placed foam insulation to fill the gap and told me I could just plaster over it.
He cut out gas lines out that I did not contract with him to replace and I had to pay someone else to put them back in.
He never cleaned his messes up. I had to clean and pay to haul it away. He lied all the time saying he would be there and never show or show up and just leave right away. It seemed to me that he made all these mistakes intentionally. Why not just put the correct electrical boxes in the first time around.
He put the electrical line for the bathroom light by the toilet and now that has to moved and I have the drywall up. So now I have another mess to contend with. One would think the contractor knows where to put the lines. I am not the expert. He was just horrible. Horrible! He tried to tell me I needed a thermostat and I found out someone removed the batteries. I know it wasnt me who removed them. I had a bolt lock there I just had fixed, he showed up one day and the lock was broke again. Wierd thinks like that all the time. Chop job contractor!
Kimberly Ingle Reviews
Branko was hired to completely rewire the first and second floor of a two flat along with putting in complete new furnace and duct work and air conditioning. After ten months of fighting with him to finish and the work is still incomplete and many mistakes.
Branko did not put the electrical boxes in to account for half inch of drywall and now when I put the drywall up the boxes will be sunk in the wall and the drywall will extend past the boxes. I discussed this problem when he first started working on the second floor and he continued to make the same mistake on the first floor. He tried to correct some of the boxes on the second floor where I had already had the drywall completed and he cut big holes in the drywall and then placed foam insulation to fill the gap and told me I could just plaster over it.
He cut out gas lines out that I did not contract with him to replace and I had to pay someone else to put them back in.
He never cleaned his messes up. I had to clean and pay to haul it away. He lied all the time saying he would be there and never show or show up and just leave right away. It seemed to me that he made all these mistakes intentionally. Why not just put the correct electrical boxes in the first time around.
He put the electrical line for the bathroom light by the toilet and now that has to moved and I have the drywall up. So now I have another mess to contend with. One would think the contractor knows where to put the lines. I am not the expert. He was just horrible. Horrible! He tried to tell me I needed a thermostat and I found out someone removed the batteries. I know it wasnt me who removed them. I had a bolt lock there I just had fixed, he showed up one day and the lock was broke again. Wierd thinks like that all the time. Chop job contractor!