I met with Andy the owner to purchase asphalt millings. He showed me two piles. One was "clean/screened" and he said there was 50-75 tons and would be $14/ton. One was dirty (had large chuncks of material in it) and he said there was 150 tons and it was $8/ton. I said I would take all of it. He said his drivers were $75/hr.
We had two drivers start at 7am on July 5th delivering the millings. They worked from 7am and their last drop was approximately 3pm. We had 21 loads delivered total. The trucks were small and they did not use the drop axle while hauling, so only two axles were in use while hauling. This means there were not loaded to capasity. At the end of the day, the drivers never came back with weight tickets or even let us know they were finished.
Carroll Construction Co Reviews
I met with Andy the owner to purchase asphalt millings. He showed me two piles. One was "clean/screened" and he said there was 50-75 tons and would be $14/ton. One was dirty (had large chuncks of material in it) and he said there was 150 tons and it was $8/ton. I said I would take all of it. He said his drivers were $75/hr.
We had two drivers start at 7am on July 5th delivering the millings. They worked from 7am and their last drop was approximately 3pm. We had 21 loads delivered total. The trucks were small and they did not use the drop axle while hauling, so only two axles were in use while hauling. This means there were not loaded to capasity. At the end of the day, the drivers never came back with weight tickets or even let us know they were finished.